Landfill and sewage gas used in the bioGas to energy industry is becoming increasingly contaminated with Siloxanes. The only permanent solution is to remove them before they reach the engine.
The Parker PpTek BioGas AK is an inline regenerative adsorption system that will chemically remove siloxanes from the BioGas, allowing engines to operate deposit free and helping to reduce emissions.
Fitted in the fuel supply line of a bioGas to energy plant BioGas AK decontaminates landfill and sewage gas of siloxanes and other VOC’s. Simple, compact, robust, self contained & regenerative, the system enables extended full-power operation, increased service intervals and payback within an operating period as short as 12 months. The media is hydrophobic repelling water consequently no costly chiller is required to remove moisture.
Depending on the levels of contamination, the change over and regeneration cycle will be programmed to take place every 12 - 24 hours. On a site with average levels of contamination the filter medium will last three years, requiring a minimum of servicing, significantly reducing downtime and the constant removal and disposal of contaminated filter media.
Features / Benefits:
• Low ongoing maintenance costs
• Media guaranteed for 5 years
• Small outline and footprint
• Stainless steel construction
• Environmentally safe
For more information or a detailed discussion about your specific requirements please contact Parker or an authorised Parker distributor.